BEULAH ELEMENTARY SCHOOL
Projects Begin Summer 2021
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
BEULAH BOND PROJECTS
ROOF UPGRADE
Current Status: Design Development
The existing leaky roof will be replaced with a new, high-quality roof system that has a 22-30 year life-span, is energy-efficient and environmentally friendly. A new gutter system will be installed to improve drainage, specifically to prevent the build-up of rainwater. This will benefit both the roof and the foundation of the building.
Scheduled to begin 5/2022
REPAVE FRONT PARKING LOT
Current Status: Design Development
The front parking lot will be graded and repaved to resolve the issue of ice build-up that occurs during the winter season. The front parking lot will also be improved by adding an ADA compliant ramp, ensuring accessibility for everyone.
Scheduled to begin 6/2023
REPLACE AIR HANDLING UNITS
Current Status: Design Development
The aging Mammoth air handling units located on the northwest end of the building will be removed. New, efficient units will be installed with the benefit of increased airflow and overall comfort of the building, as well as easing the maintenance burden and increasing energy efficiency.
Scheduled to begin 6/2022
GREENHOUSE ADDITION
Current Status: In Progress
To strengthen the agricultural program, a greenhouse will be built behind the school. The geodesic shaped greenhouse will be 855 sq. ft and will be able to accommodate 8-10 people comfortably.
OFFICE AREA AND ENTRANCE RECONFIGURATION
Current Status: Design Development
To accommodate many changing needs, the office area will undergo reconfiguration. The counselor’s room will be used as the nurse’s room, and the current nurse’s room will be used for isolation purposes. The entire office area will be shifted forward for added security and to safely direct student traffic. With the shift of the office space, a corridor will be created to access the classroom hallways found in the north end of the building.