RYE HIGH SCHOOL

Projects Begin Summer 2021

atencio_ryehigh1.jpeg

TAKE A TOUR

During Construction, check back for weekly updated progress photos.

Rye HS door.JPG
Rye High presentation.JPG
Rye High Ag shop
ghows-CO-200619946-bd07bb41.jpeg

RYE HIGH SCHOOL

Scheduled to begin: 6/2022

ROOF UPGRADE OF ORIGINAL BUILDING

Current Status: In Progress

A new roof will be installed on the older part of the building, eliminating problematic leaks in the facility. The new, high-quality roof system will have a 22-30 year life-span, is energy-efficient and environmentally friendly.

REPAIR SOUTHERN WALL’S WATER DAMAGE

Current Status: Design Development

The water infiltration issue found on the south building wall will be addressed, and water damage to the structure and the windows will be repaired.

ART ROOM DOOR REPLACEMENT

Current Status: In Progress

The old garage door located on the exterior part of the art room will be replaced. This will help the conditioned air remain in the space and keep the space conditioned regularly.

REPAIR WATER DAMAGE ABOVE OUTDOOR RESTROOMS

Current Status: Design Development

Water damage from a previously leaky room will be repaired. This will include repairs to both the exterior and interior surfaces, which will improve aesthetics.

PAVE DIRT PARKING LOT

Current Status: Design Development

Scheduled to begin: 4/2022

Pave the west dirt parking lot in order to give it a more modern aesthetic while also helping address the drainage issues found in that area.

REPAVE BEHIND PRESS BOX

Current Status: Design Development

Scheduled to begin: 6/2022

The area located behind the press box will be repaved. Fixing this area will help improve supply deliveries as this area is also connected to the back of the cafeteria. This will help ensure the safety of both school faculty and drivers.

INSTALL WINDOW FILM

Current Status: COMPLETE

Entry area windows will have 3M window film installed. This reflective film improves privacy and security by preventing people from looking in. In addition, it increases the energy efficiency of the building by reducing the heat gained through the window.

GYM ELECTRICAL EQUIPMENT UPGRADE

Current Status: In Progress

A new scoreboard will be installed in the main gym. The scoreboard from the main gym will be relocated to serve as the auxiliary gym scoreboard. The main gym’s sound system will also be upgraded for use during both practice and home games.

AGRICULTURE SHOP ADDITION

Current Status: Design Development

Scheduled to begin: 3/2022

More space will be made for the Ag shop classroom by extending the building by about 20 ft towards the main building. This expansion will give the new classroom an additional 800 sq. ft of space to utilize.