RYE HIGH SCHOOL
Projects Begin Summer 2021
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
RYE HIGH SCHOOL
Scheduled to begin: 6/2022
ROOF UPGRADE OF ORIGINAL BUILDING
Current Status: In Progress
A new roof will be installed on the older part of the building, eliminating problematic leaks in the facility. The new, high-quality roof system will have a 22-30 year life-span, is energy-efficient and environmentally friendly.
REPAIR SOUTHERN WALL’S WATER DAMAGE
Current Status: Design Development
The water infiltration issue found on the south building wall will be addressed, and water damage to the structure and the windows will be repaired.
ART ROOM DOOR REPLACEMENT
Current Status: In Progress
The old garage door located on the exterior part of the art room will be replaced. This will help the conditioned air remain in the space and keep the space conditioned regularly.
REPAIR WATER DAMAGE ABOVE OUTDOOR RESTROOMS
Current Status: Design Development
Water damage from a previously leaky room will be repaired. This will include repairs to both the exterior and interior surfaces, which will improve aesthetics.
PAVE DIRT PARKING LOT
Current Status: Design Development
Scheduled to begin: 4/2022
Pave the west dirt parking lot in order to give it a more modern aesthetic while also helping address the drainage issues found in that area.
REPAVE BEHIND PRESS BOX
Current Status: Design Development
Scheduled to begin: 6/2022
The area located behind the press box will be repaved. Fixing this area will help improve supply deliveries as this area is also connected to the back of the cafeteria. This will help ensure the safety of both school faculty and drivers.
INSTALL WINDOW FILM
Current Status: COMPLETE
Entry area windows will have 3M window film installed. This reflective film improves privacy and security by preventing people from looking in. In addition, it increases the energy efficiency of the building by reducing the heat gained through the window.
GYM ELECTRICAL EQUIPMENT UPGRADE
Current Status: In Progress
A new scoreboard will be installed in the main gym. The scoreboard from the main gym will be relocated to serve as the auxiliary gym scoreboard. The main gym’s sound system will also be upgraded for use during both practice and home games.
AGRICULTURE SHOP ADDITION
Current Status: Design Development
Scheduled to begin: 3/2022
More space will be made for the Ag shop classroom by extending the building by about 20 ft towards the main building. This expansion will give the new classroom an additional 800 sq. ft of space to utilize.